Above photo is a system to totally inspect Trans which is of small size, and of which all input, output lines are of pin type. This system shows an example the form that Test jig has two lines of A,B to shorten the loading and unloading time. Regarding Test items, all items of explanation are automatically processed. General Inspection on the electrical efficiency of Trans is perfectly performed by these tests.
To thoroughly test all kinds of Trans, the following items have to be tested (refer to Figure).


Unload Current test Test how much input current flows on the condition of impressed regular working voltage to the primary part (P part)
Puncture test as below Figure, in case that a second part(S part) output is four, the places of Puncture Test are between P and core, P and SS, Core and SS, SS, That is, Puncture test is performed between 4 coils mutually. Therefore the no. of total step which needs Puncture test is 4 times.
Surge test P part one time, one time on the condition of the connection of every SS. Total 2 times
Insulation test one time between the connection from P to SS and Core, one time between the connection from SS to P. Total 2 times
A second voltage test output voltage test from every SS, each one time


Standard Specifications
Equipment working voltage AC110 V, 220 V, 50 ~ 60
Supplied voltage to Test Trans AC 110 VAC 440 V, or Sin wave of 20 60 (SMPS Trans)
Test item - Unload current test(Io)
- Surge test
- Puncture test
- Insulation test
- A second part output voltage test
Test step 412 step
Test time 712 sec
Dimensions Cabinet type or the same system type as Jig table of Photo.