 Photo
explanation
Above photo is a system to totally inspect Trans which is of small size, and of
which all input, output lines are of pin type. This system shows an example the
form that Test jig has two lines of A,B to shorten the loading and unloading time.
Regarding Test items, all items of explanation are automatically processed. General
Inspection on the electrical efficiency of Trans is perfectly performed by these
tests.
To thoroughly test all kinds of Trans, the following items have to be tested (refer
to Figure).
|
Unload
Current test |
Test how much input current flows on the condition of impressed regular working
voltage to the primary part (P part) |
|
Puncture
test |
as below Figure, in case that a second part(S part) output is four, the places
of Puncture Test are between P and core, P and SS, Core and SS, SS, That
is, Puncture test is performed between 4 coils mutually. Therefore the no. of
total step which needs Puncture test is 4 times. |
|
Surge
test |
P part one time, one time on the condition of the connection of every SS.
Total 2 times |
|
Insulation
test |
one time between the connection from P to SS and Core, one time between
the connection from SS to P. Total 2 times |
|
A
second voltage test |
output voltage test from every SS, each one time |
|
Standard
Specifications
|
Equipment
working voltage |
AC110 V, 220 V, 50 ~ 60 |
|
Supplied
voltage to Test Trans |
AC 110 VAC 440 V, or Sin wave of 20 60 (SMPS Trans) |
|
Test
item |
- Unload current test(Io)
- Surge test
- Puncture test
- Insulation test
- A second part output voltage test |
|
Test
step |
412 step |
|
Test
time |
712 sec |
|
Dimensions |
Cabinet type or the same system type as Jig table of Photo. |
|
|